seilbahn.net | Projects | Archive | 2012-10-04

Snowbird / Utah: New Little Cloud High-Speed Chairlift

In the summer of 2012 Snowbird’s original Little Cloud chairlift was taken out and replaced with a new high-speed quad. The new Little Cloud will follow the same path and use the same tower locations as the old chairlift but feature a much shorter trip time.

Chairlift Facts

3.5-minute ride (old lift was 7 min)
57 quad chairs (old lift had 134 double chairs)
90-degree off-load (faces East)
3484.7 linear feet
1,800 riders per hour
Powered by a single 600HP top drive
Installed by Doppelmayer USA

www.snowbird.com












Zurück
Fotos hinzufügen
Drucken
Email


Google Adsense