seilbahn.net | Projects | Archive | 2012-11-08

Tatry mountain resorts / Slowakia: Construction of the new “Twinliner”

manufacturer: ABS Transportbahnen, DOPPELMAYR
Type 50-SSB
Start of operation: Winter 2012/13

capacity: 324 p/h
Fahrzeit: 4,1 min
speed: 2 m/s
lenght: 360 m
base station: 1225 m
top station: 1349 m
cableway name: JASNA -  PRIEHYBA  A4

The top station of the Twinliner will be connected with the new Funitel down station.








Zurück
Fotos hinzufügen
Drucken
Email


Google Adsense